|
|
|
|
1
Left sling assembly - 3 MS (Machine Screws) |
2
Right sling assembly – 3 MS |
3
Left sling 3 star posts with rubber ring – 2 MS, 1 WS (Wood
Screw), long stud on top, short stud on bottom |
4
Right sling 3 star posts with rubber ring – 2 MS, 1WS, long stud
on top, short stud on bottom |
|
|
|
|
5
Wire ramp to left inlane – 1 MS |
6
Wire ramp to right inlane – 1 MS |
7
Plastic above right 2 targets – 2 WS, 2 nuts |
8
4 star posts around right targets – 3WS, 1 MS, 2 studs closest
to targets |
|
|
|
|
9
Lower arch – 2 WS |
10
Rod and reel plastic cover – 3 MS, 1 nut w/washer |
11
plastic (-15) behind left 2 targets – 2 nuts |
12
4 star posts to left of left 2 targets – 1 MS, 3 WS – stud on
middle and behind |